why the horizontal crack occoured in the joint between
brick work and lintel?pls. give clarification???
Answer Posted / pranav
because of settlement of masonry, we can avoid it by
constructing last layer of bricks 3 or 7 days after
construction of wall
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to find CN by using arcgis 9.3?
what are the proper pipes for salt water line
Use of coping on terrace wall and in 4" wall is compulsory or not ?
What is c.g.i sheet which used for roof??
What do you meant by gui?
reinforcement slab, beam and column formulas?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
What do you mean by honeycomb in concrete?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
What is gravity flow?
what is concrete canvas?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.