how to laying tarfelt on asbestos roof for leeks water?
Answer Posted / devineni
first clean the asbestos sheet with wire mesh.
sprinkle the tar on sheet at tar temp 90 c
sprinkle the course sand on the sheet
remove the tarfelt cover and press it on the sheet
it should done on dry sheet with 40c of temp for best result'
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define What are the uses of Groynes?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
how much used soil in 1 brick of standard size?
Design a rectangular channel.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Gidc technical que paper
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
what is the painting co efficient of slope roof tiles?
how much cement sand n bricks required in im3?and how much in plaster?
what are the layers of the national and heir aprox thickness??
How do You Maintain a structure after getting cube test of low strength.
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar