Answer Posted / sjtbehera
lever arm is defined as the distance between pont of
application of force of compression to force of tension.
formula of obtaining is= d-n/3 (d= depth of effective depth
n= neutral axis
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Define block?
Explain what is Critical Path Method (C.P.M)?
How foundation is designed, Column design and beam design
What in your past experience or education prepares you for the position for which you are applying
What is an ortho mode?
i need gate exam civil engineering question papers with answers
The largest size of paper used in plotter to print the drawing made by Autocad .
natucher of concrete &type of concrete?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
Describe the role of independent Quantity surveyor?
What are the reasons for geotechnical site investigations in uganda?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
it is possiblee to produce concrete with out cracks...