Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Pipe Lin Question

Answer Posted / mechanical engineering

pipe line all question

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir i need section engineer test papers

2778


What are the benefits of cycloidal gears?

1102


If gas turbine is operating on part load, how droop will affect the output with respect to frequency.

2031


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1808


What is the spinning jenny?

1063


Differentiate Between High Speed coupling and high torque coupling with examples.

2182


If mft not act when spark failure 3 time what problem will happen in boiler side

2464


WHAT IS THE TOTAL HEAT RATE OF PLANT AND WHAT IS THE HEAT RATE OF BOILER?

2214


What is net refrigerating effect of the refrigerant?

1032


hi, im rahul i working on project BUSINESS PROJECT REENGINEERING,IM DOING MY PRODUCTION ENGG & BPR IS MY FINAL YEAR PROJECTS, HOW CAN DO MY PROJECTS? I KNOW NX3,CATIA,PRO-E SOFTWARES (MODELING SOFTWARES)

1898


In 1983 what changed about the length of the meter?

1115


Explain the types of elasticity?

1120


Why in screw & centrifugal compressor using rolor bearing

1993


What are the causes of I.O. high temperature in a diesel engine?

1881


If percentage elongation of a material is more than 200%, it is classed as ?

1294