Hi guys,
Design job sequence,
we have 3 sources, in that 1st source in abort then only run
the remaining sources..
How please design the job.
Thanks.
Answer Posted / babu
hai Ankit,
we have to give only for jobactivity1(failed conditional),
remaining jobactivity2 and jobactivity3 have unconditional otherwise ok conditional...
(I think)
thanks.
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
What is orabulk stage?
What are the different options associated with dsjob command?
tell me 5 situations when we r using oracle db stages like orecle connector, oracle enterprise
How can we improve performance of data stage jobs?
Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.
Notification Activity
In Datastage, how you can fix the truncated data error?
Describe the main features of datastage?
Have you used Unstructured data?
How many types of hash files are there?
what is ds administrator used for?
Whats difference betweeen operational data stage (ods) and data warehouse?
WAT TYPE OF PL/SQL QUERRYS USED IN DATASTAGE
What is use Array size in datastage
Define Job control?