calculation of quantities of cement and sand in 1cum mortar
with 1:6 ratio
Answer Posted / muslim khan
i can convert the Motor into dry *by 1.27 (1.27cum) then after
divide by Moter with some of ratio 7(1.27/7=0.181cum Cement)1bag
of cement =to 0.0354cum(0.181/0.0354=5.12bags of cement)and sand
is = to 1.08cum.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Can we use concrete of slump cone in cube casting in which we have already measured slump?
what is the permanent solution applied for restoration of leaning tower of pisa?
I am called for interview from north east power plant .so, I need some interview question which may help me.
Define What are the uses of Groynes?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
how many shuttering material required for 1000 sq.m built up area.
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
What do you mean by bond? What are the different types of bonds?
what values & beliefs have guided you in your career path
Exterior Joints,define
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
What is proportion of PCC Grade G?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
Define What materials were used to build the Golden Gate Bridge?