what are the ffactors you considered choosing the course?
Permissible wastage of cement as per IS code ? In which IS code I get it?
Explain what is alternate bid?
how to identify the failure of building by expansive soils
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
why the openings of sieves are square io size?
a butt weld is specified by
How to find beam R/F cutting length
how many minimum admixtures are used in water froofing structures
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
How to determine spacing of bars in slabs or beams