What is pre-stressed concrete?
how to clculate the %of concrete strenght achive after curing?load
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
Which is the latest version of solidsworks?
Explain the design for rcc multi-storied building?
400 ku d/c clearess ketan hota hai?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
what is Short bored pile foundation.
What is passive earth pressure ?
WHAT DLC DESIGN IN CONSTRUCTION
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
what is the construction cost for per cft of multistorryed building in kolkata?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
Explain what are the phases inspections are done by local authority while construction?