my quation is what purpose use free goods delivery control in
sap sd free goods that filed more option is blank .a b.c,e
What purpose yu filed
Answer Posted / hanh
What is your question?
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
How do you control entry possibility of condition values at order through condition type settings?
I created a new info structure and activated update rules for it. What is the best way to transport them into a productive system?
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system
What is the structure of delivery document? What are the characteristics essential for combining more than one sales order as one outbound delivery?
What copy control is and when copy control transition can be done? In what manner copy control transition can be done?
What’s the process of pricing procedures determination?
Can anyone tell me please how is the availability check carried out, how is availability working out in your job business, how is the ATP (availability to promise) is configured?
What is alternative condition type? Give an example?
What is pricing procedure determination?
hi friends i am Manohar from hyderabad.i have recently completed MBA+SAP SD -now i am looking for a job-what is best way to get job? can get job as fresher? or with fake experience? i am in a confusion plz help how to approach companys or consultancy which can provide sap job? plzzzzzzzzzzz
What is the business process of excise tax and how do you relate that in sap?
It will be really helpful if someone can provide an example / System behavior where (1) only AC is used, (2) only TOR is used, (3) both AC & TOR is used ( in schedule line category) thank you
What are the different activities under consignment stock in sap sd?
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.
how to fill the GAPs in BBP?give me one example thanks in advance venkatesh