Pl answer. when we deduct 2d for cutting length of 90deg
bend, whats the method of booking measurements as per IS
code? whether cutting Length to be booked or something else?
Answer Posted / sjtbehera
yes booked
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
i need gate exam civil engineering question papers with answers
How to check slab shuttering level.? Or check list for slab ?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
Why the statue of liberty is made of copper?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
what is the calculation of raw material for 0.35cum of m-15
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
how we calculate the vol.of wet concrete..?
acceptance criteria for concrete works
all technical question
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
Explain the water bound macadam roag
What is need for setting limits?