Pl answer. when we deduct 2d for cutting length of 90deg
bend, whats the method of booking measurements as per IS
code? whether cutting Length to be booked or something else?
Answer Posted / sjtbehera
yes booked
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
What is Base Shear ?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
why the profile of shell of natural draught cooling tower is hyperabolic.
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
What is the general specifications of a bituminous pavement road?
what is diffrence between catchment area,watershed and basin?
In cement concrete how to check a quality of material also proportion of material at site ?
What are the RISKS during the project construction?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
What is the name of this multiplication factors ?
What is a tensile strength? What is the tensile strength of wood?
What do we mean by partial moment release ??
what is meant by csr in foundation? what is sbc?what is meant by contour line?