U are a civil engineering student?why do u want to enter
into IT industry
Answer Posted / satish
because,IT industry is built by civil engineer
| Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
what is a well
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
Rate analysis of Vitrified tile in cement mortor 1:3
How can i display 5 asterisk and another 5 asterisk )?
What is a bearing capacity of soil?
What will be weight of 0.5mm GI sheet per sq.ft?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Please design 12.5m long dubbly beam
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
what is labour consume factor in residential projects
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Describe a time when you anticipated potential problems and developed Preventive measures