Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many bags of cement are needed to make a cement mortar
of 1:3

Answer Posted / jothi

48 kg/sqm

Is This Answer Correct ?    2 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is density of 20mm coarse aggregate.plz send answer my below adress e.mail

2143


what is relation between SPT N value and driving piles after conducting a soil test?

2186


how to take concrete quantity for precast segment for viaduct project?

3101


What is the strength of 1:6:12 mix?

3070


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1740


suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

2719


How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.

2675


Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

2146


what is the difference b/w full length and cutting length?

2224


what is the weight of 10mm,20mm,40mm aggregate

2451


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2269


How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete

1758


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

2114


What is rate of concrete surface rendering work per sqm

2012