Answer Posted / mahesh
0.05
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
how lap length is increased with increase of Grade of steel?
why we create short columns under grade slab?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
What is alternate bid?
at which depth the construction of tunnel is economical from cost and engineering aspect.
How many feet are in 4 square yards?
In Rcc ratio calculation I wanted to know quantity of Steel also.
Please design 12.5m long dubbly beam
Define What is diversion tunnel in a dam?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
What applicable rate of wct in bihar
insted of bentonite we can use any alternate material in piling ?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.