i hav 2 logical files(L1,L2) both r derived from one physical
file(P1). how can i use both the logical files in one RPG
program? if yes what i have to d.

Answer Posted / ramrdy

hi henry, i used diffrent rec-formats in L1 &L2. but i want more clearly.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to handle duplicate error handling in RPG?

1687


Interviewer asked me write down DDS for load all subfile .can anybody write dds

1026


what is data area and how it is used in rpg program ?

758


what is the necessary keyword needed to scroll subfile records?

707


can you debug ile rpg program using isdb?

741






What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?

2521


Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg

721


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1567


1. What is bound-by-call and bound-by-reference? 2. Where and why is *Nomain used? 3. What are the difficulties faced by programmers when using service programs? 4. Explain the different ways of parsing and compiling XML in iSeries.

5429


Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?

519


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1765


How can we override a file during runtime in rpg?

690


how can I tell when to replace the array?

706


How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique

553


how do I play {insert rpg system here}?

589