what is the main purpose of line PT and bus PT?
Answer Posted / v.doraiswamy
Line PT:The Line PT is located on line side of the Feeder.
This will have normally has two secondary cores.The core
with accuracy cl.1 is used for metering purpose(ie)
measuring Voltage,watt,var etc. Core with accuracy cl.3P is
used for Porotection like distance scheme relay,
directional O/C,E/F relay. Also metering secodary core is
used synchronising the line with Bus.
Bus PT : The Bus PT functions are same as Line PT. But This
is located on the main Bus and this can be used for all the
circuits being located in the Bus. For cost point of view
it better to have common Bus pt for all the circuits.
Is This Answer Correct ? | 13 Yes | 4 No |
Post New Answer View All Answers
why we testing the core balance of the transformer before comissioning?
what is the differences between microprocessor and general purpose computer
(1)Can earth and be conected together (2) what is the diferent between earth & neutral
prove that power consumed in 3 phase delta system is 3 times as compared to 3 phase star system
This is urgent!! What is a Thyristor-based 3-ways selector switch with Zero crossing control? how does it operate and where is it mostly found in a system?
i have attended the interview on 4th June,08 at Kolkata in IOCL, can anybody tell me what is its result
what is the difference between changer, converter and transformer?
what is the function of gss in the dg set.
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
please send previous exams question papers
How can we increase the capacity of Energy.?
Is it possible to make a 5P10/ CT Ratio 50/1A Burden 5VA
why tertiary winding is used in transformer with diagram?
if 2 coil of 1000W connect in series and 200 v is applied across it . then what is the total power of coil when coil have only resistive load .
george phenomenon of synchronous machine