Answer Posted / bharath m,+91 8438238335/99806
2.50 to 3.00 Kilograms Per 1 No. Approximately
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
what is raft foundation
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
What is Critical path in Ms-Project ?
what is the weight of 6000 psi concrete in lb/cft?
Write short note on construction programme for pile foundation.
how to prepare site mix design
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
How can I make justification between using concrete grade c35 compare c37?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is the significance of cost estimate knowledge for an architect?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?