levelling least
count

Answer Posted / guest

0.05

Is This Answer Correct ?    7 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

1694


how much required strength of cement concrete bricks(size 230x115x75mm)

1674


plumbing CPVC fitting FTE Brass full form

2279


How many square meter can a worker/labor demolish a structure per day?

1657


What do you mean by the word 'shear'?

1926






what is the types of door's wood?

1691


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3429


A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals

1878


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1437


How many square meter can mason layout chb per hour

1894


for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

1627


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

4578


how can calculate cutting length of diamond ring

1462


What is the maximum strength of cub compress strength in one cub testing

1498


What is Base Shear ?

750