Answer Posted / umair naqvi
volume of steel *7850
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
how u design STAGING for Superstructure in BRIDGE construction?
how to determine H- zone in a column? where it will occur?
What Reinforcements Are Used In The Process Of Prestressing?
How to calculate canal slope curvature qty!
how to prepare site mix design
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
Process of pcc in wateredug
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
How to construct a water sump in a rocky soil?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
explain the advantages of total stasion
What is the use of mirror command?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700