1)What is swear, swage and storm water?
2)What are the sizes of bricks based on Nominal, practical
and standard?
3) What is the distinguies between the grade of cement 43,
53?
Answer Posted / sreenu b
1 Sewer is the structure which is used for the purpose of
disposal/flowing of Raw water
Sewege is the waste water coming from w/c or such dirty
water with bad smel
2 standard-19cmx9cmx9cm
normal-20cmx10cmx10cm
3 1. Fineness of cement. 53 grade fineness compare than to 43
grade cement.
2.compressive strength of concrete.
3.Low content gypsum so, 53 grade Fast Harding compare than
to 43 grade.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What is the strongest bridge for a school contest?
Define What is an ice dam sock?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Advantage of Aluminum form work in terms of activities can be skip and cost too
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
What is Time period of a building and its relation with frequency ?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
how much of the strength comes from post-production curing
What is the average density of soil?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
What are the advantages of cad software’s?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
List out some of the checking’s, done at the completion of construction?