ABB DCS (AC 800 M)redundency take howmany milliseconds to switch
from master controller to slave?should be less than DCS scanning time?
Answer Posted / anand.r biocon limited
less than 10 ms
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what does the ratio 800-400-300-200/1-1-1-1-1 in the specification of current transformer indicates?
how we are selecting instuments by differentiating certain instruments in 4 to 20 ma range and certain in 1 to 5 v dc
what is the difference between Cv and air consumption? why the customer needs Air consumption details?
In bently nevada vibration monitoring system,what is the reason to maintain the Resistance of the probe + extension cable equal to 95 ohm? If possible explain the basic principle of measurement with detail electronic circuits.
How will you calibrate an Absolute Pr.Transmitter of range 400mmHg absolute ?
how to check earthing,what is minum ohms for proper earthing
god evening sir i am studying m.sc(tech)electronics &instrumention.am i elegible to all industies
If P will increase then what will happen with PID?
Somebody can explain me about >Critical Loops, calibrations, ESD critical Loop checks, Logic Diagram / Cause & Effect checks for ESD loops,
How is flow measured in square root?
how to calculate control valve bonnet size?? or how to select its material?
what is the reason while warning lamp is on while the engine is cranking?
Hi my friends Is any one who can assist me in knowing the typical interview questions for system engineer at General Electric pty Ltd
installation process of orifice,a question asked for confusion creation in interview by BARC 1.if orifice is tightly fitted with pipe ,it will act like venturi 2.if orifice is left hanging in between liquid it will not create the pressure difference exactly,
Why we are using reverse action in displacer types level transmitters on some Vessels?