what is the abbreviation & meaning of UI charges
Answer Posted / nagarajan
Un scheduled Interchange charges. This charges is being
collected by Regional Load Despatch Centre based on frequency
which is called ABT(Availability Based Tariff)Regulated by
CERC (Central Electricity Regulatory Commission)
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
how much cable size required for 70 kilowatt load.
What is the use of lag compensator?
Why is the starting current high in dc motor?
please send the last 5 years {{{JUNIOR ENGINEER - ELECTICAL, ELECTRONICS RRB CHENNAI and secundrabad}}} TECHNICAL question papers TO MY EMAIL ID dinesh100701@gmail.com
what will happen if the prime mover on the field excitation of the on-coming generator fails?Explain.
How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???
explain types of electric welding and its applications
Why are short circuit ratings always 16kA,25kA,36kA and 50kA.Who has fixed these?
How many methods use the load flow solution?
Define closed loop control system.
What are the advantages and disadvantages of open loop control system?
what is the Connected Load (kW) or Contract Demand (kVA)of mahindra nasik plant??
to hook up ten 50 amp rv pedastels at a lenth of 600 feet from the service what size will my service need to be and the size of wire will I have to run to each pedastel in series??????
What are the function of different components of servo motor?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?