Hello Gurus, Please confirm who creates Bill Of Material in
Live Scenarios. I know the t code - Cs01 and the menu path
as well? Creating BOM item:
- Logistics
- Sales and distribution
- Master data
- Products
- Bills of material
- Material BOM
CS01 create
Are SD guys responsible to create BOMS?
Answer Posted / vinoth sing
End users job.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain credit management.
Plant to plant is handled using mb1b. If stock transfer orders with deliveries are configured, use me27.
Name at least five features that you can control for the item category?
Explain what a condition table and an access sequence are and the relationship between them?
what is application key in account determination where its mentained. plz ans its urgent
Hi, Can anyone proivde the soluiton for the below senirio, thanks in advance. We are providing test services to various sites of a corporate. Now, we want to bill as a single bill point i.e. Corporate office. Single bill for each site will be generated. E.g. Panac Labs, New Delhi Head Office Panac Labs, Mumbai Lab at Mumbai Panac Labs, Kolkata Lab at Kolkata Panac Labs, Indore Lab at Indore In above case, we are cattering services to all four locations. However, New Delhi is the Head office and Lab too. Hence we will issue four bills addressed to Panac Labs, New Delhi. Outstanding and debtors will be maintained on A/c of Panac Labs, Head office. We also want to maintain sub- ledger base on sites
What are the user exits?
what are the sales document types in sap? What is the configuration step to define sales document type in sap sd?
what is consignment stock process?
There is an interface between sd and fi in invoicing. Can you think of another interface between sd and fi?
What is the difference between vk11 and vk31?
What is sales and distribution (sd)?
In R/3 we can represent a company's structure by defining and assigning corporate structure elements. What is the purpose of doing that?
how offen sand box server refresh?
Can anyone tell me please how is the availability check carried out, how is availability working out in your job business, how is the ATP (availability to promise) is configured?