Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

explain why direct on line starting toque and current may
not be acceptable

Answer Posted / vdw

If a system needs high starting torque then corresponding motor will draw very high current, in such a case it may get overload or probably causes electrical flash which is not acceptable. The remedy for this is to use star delta starter for the motor so initial current drawn by motor will be within safe conditions of motor.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the trip circuit supervision in an electrical meaning?

2133


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1711


what is the basic use of power plant in equipment

1761


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2496


what is restricted earth fault explain in details

2051


procedure of how to generate power in solar plant.

1956


can dp type level transmitter work in under vaccum condition

1991


what is the difference between compensated & normal drum level in boiler drum?

1811


why airtel use + 24 volts and other operators use -48 volt

2633


LAPT working in alternator / generator

3635


what is natural frequency of turbine shaft .

2305


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1005


what does mean by kva rating

1520


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2546


How We Calibrate the vaccum transmitter?

1978