Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is input and output cards of plc needs to be hot
swappable mean

Answer Posted / carl_ellis

To 'swap' is to 'exchange'.
'Hot' means electrically live and powered.

The term "hot swappable" means that an I/O card can be
replaced while the PLC/PAC/controller rack/chassis is
powered and running.

The assumption is that the controller will recognize
or 'see' the replacement card and do whatever
initialization is required to bring the I/O card back on-
line.

An I/O card that is not 'hot-swappable' requires a cold
start, power-up, initialization sequence for the controller
to recognize the card.

Tell 'em Carl sent you.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why would you like to join our company

1314


we want to control pump in let pressure and tank (for exp) our inlet line if water cam and pump will on and when our tank will full pump will off also if our inlet pressure low pump will off even tank not full.this pump i want to uses on our water supply line.

1655


Name different parts of a pressure gauge.

1058


where uses EXe /EXd/Exo/Exn/Exp/Exq/EXia

9844


Explain working principle of lvdt?

1038


NSV type probe stands for

2338


which type of signal used in instrument?

9678


How can you add value to this Industry if offered the job?

1520


the 3 most common transmitter protocol being in refinery or qatar gas and aramco.

2892


I have completed B.E. Instrumentation & control in 2009. i have 3 year industrial job experience in chemical plant.now, I want to join M.E. in external. so, Plese say easiet way and good institute name.

1861


What are primary elements of measuring pressure?

1226


which processor is used in dcs.

2204


how to connect transmitter measuring sulfur process? 1-by using long impulse line or 2- by using coated short impulse line

2054


which type inter lock use in petrochemical refinery,and oil & gas?

2969


How to calibrate smoke Dectector

1585