the building construction what type of equipments are used
in site and its purpose?
Answer Posted / karthik
Normaly we used following equipments at site,
1.Tower Crane - Its used only if the area and & hgt of
building is more.Its used to save the time & manpower.
2.Excavator/Shovel/Back Hoe Loader(JCB) - For earth Work
3.Mobile Crane/Telehandler/Skid Steel Loader(Bobcat) -
Materila loading unloading
4.Generators
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is a hatch patterns?
HOw much % of premium on DSR-2013 currently
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What you understand by building codes?
How to calculate material and labor required for 100 m2 plaster?
What is passive earth pressure ?
Explain what is the difference between built area and super built up area?
how to control PQI (Project Quality Index)
How much time Required for PPR pipe network testing
what is the clear cover for shearwall?
Define What is an ice dam sock?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
Which tests are performed on soil to decide the type of foundation to be provided.
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.