Answer Posted / dileep
commutator converts i/p DC of the motor to AC in the rotor
i.e armature .so here it is acting as an inverter ........
it acts as a rectifier in the case of DC generator
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
10 tube light connect in mcb breaker.one tube light is fault.so breaker is tribe.how fault is rectified.(using 3wire phase,earth,neutral)
How much of the total hydro power potential has been exploited so far in india?
Why have to use copper cable for local isolator to motor ?
what will happen if multimeter(selector switch at DC voltage) and terminal at current is connected to DC supply?
How may I enrol or get admission to your program?
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
I am a possesor of c licence from 1993. I forgot to renew during the year 1998. During that time I was working at TNEB to till date. Is there any possibility to get renewed? or to apply for a new one?
Dear sir, I have completed DECE in the year 1995. I have work experience in HT and LT LINE more than five years. Now i am doing BE in EEE from rajasthan university. After completion of BE,can i apply "C" Licence sir? Please reply.
What will be the output voltage of a transformer if it is primarily energized from a square wave voltage source?
How we calculat the NGR of 3phase Generator, Our generation voltage 11KV
can any one tell me about the Extra low voltage systems?From where we give supply to these type of systems??
What is the criteria that generally follow by distribution licenses to fix contact demand of their industrial customers?
How to calculate phase to phase difference ?
in power generator normaly voltagr betwween esth to neutral is 0 but my work place generator show the volatge is 60v any body know why? thanks
We have 5 Distribution sections with variable loads&We have 3 Gensets(500kva,380kva&250kva) our total load is between 400kva to 600kva. so how could we connect 3gensets.