how much binding wire required per tonne slab beam columns
Answer Posted / rajkumar
10kg/ton
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
how many time use of plywood shuttering and IS code
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
what is called Bulk Density of aggregate?
How do you compute volume of airflow?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
For the construction project what capital cost has to be taken in consideration?
how to absorb to site basic corrections? which are the important correction?
List out the potential risk factors for workers on the construction site?
Explain what is progress payment?
Is there the dry coefficient of cement is constant?
Explain the different types of building contracts?
What is the different type of slump test indications?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.