how to take quantity in triangle section for calculating
tender purpose
Answer Posted / guest
L x L = AREA and divided by 2
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
How is the leaning tower of pisa supported?
sir please send me campus placement questions in civil engineering
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
How you can use different dimension tools in cad? What are the different dimensions available?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
how to calculate load bearing column
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
What is labor and material payment bond?
How much material will consume for following specification water tank (9*7.5*6 feet)?