Answer Posted / rakesh
PROCESS OF "charged the battery in DG" :-
DG GIVE ELECTRICAL POWER(AC VOLTAGE)AND CONVERT THE DC VOLTAGE
AND LIMITING THE VOLTAGE AS PER REQUIREMENT(BATTER VOLTAGE) AND CHARGE THE BATTERY
DISADVANTAGE :-
BATTERY CHARGING DEPENDS ON TIME & AMP. BUT DG ONLY FOR EMERGENCE PURPOSE(SHORT TIME PURPOSE). SO IF YOU CHARGING BATTERY THOUGH THE DG IT VERY COSTLY.
ADVANTAGE :-
SOME PLANT HAVE SOME SYSTEM SHOULD NOT "SHUT DOWN". IN THAT CASE IT HELP TO GIVE SOME TIME
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I want to calculate how much capacitor we connect to maintain the unity power factor? Is there any formula? Pls give me the answer
why the projects getting loss?
33kv substation lay out details & line to line & line to earth measurements
Please send 110 kv sb station full single line drawing(sld)
What will be the voltage impact on secondary side of two transformers with different vector groups when both voltages are compared.
How is operate breaker failure scheme in substation
11 kv input, 66 kv input advantages
1) Explain why we don't link the two earthing system ht and mv on a pole mounted transformer sub-station.
What are the disadvantages of autotransformer?
what are the parameters plays a major role in Potential transformer Burden calculation??
What is the Basic Difference bitween Long Shunt Connection and Short Shunt Connection in DC Generator?
What is the equivalent circuit of a transformer and its vector diagram?
how can tell us the AC indoor or outdoor which Tr and formulls
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
HOW TO CALCULATE EARTHING SIZING?