Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

If 110 volts ac is mixed up ith 12 volts dc what will be the
resultant voltage and what is the wave form?

Answer Posted / kj

The wave form will still be the same.
It will be offset from the zero line by 12 volts. The
positive half cycle would then be to 122 volts and the
negative half cycle would be 98 volts at peak.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the application of over current relay?

5352


explanation of mesh bus bars

2210


is it possible to have dc motors on single chip

1888


Hello sir i m student of gtu .what is idp.

2241


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1916


various transmission tower like .,D tower ,K.C.O tower ,C.C.O tower,K.C.R tower ,C.C.R tower ,H.C.O tower in different tons.

3373


Different types of relay fault which phase sequence??

953


why do we use 25kv supply for traction purpose?

1970


According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor

2026


What is mean by Sensitive Earth fault & what are the effects

4611


Why hydropower stations are preferred solution for meeting peak loads in grids?

1057


Please tell me the earthing procedures adopted for the STAR-STAR 3 Phase transformer in india and give a better sugession for earthing

2021


What are the difference between normal application Transformer and Solar application Transformer?

1704


What are the different types of transformers?

1235


what is meant by poly phase induction motor ? how its operating by single phase or three phase?