Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the dp across a orifice plate & how much is
permanent pressure across an orifice plate.

Answer Posted / ganesh

1.DIFFERENCE BETWEEN UPSTREAM PRESSURE AND DOWNSTREAM
PRESSURE IS THE DP ACROSS ORIFICE.
2.PERMANENT PRESSURE ACROSS ORIFICE IS NOT FIXED.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to control flow variations in magnetic flow maters..... When i will provide proper earthing?

2272


anybody having Qatar Petroleum questions for instrument Technician offshore ....please send me

5975


Instrumentation symbols interpration, P& ID, Logic diagram analysis, Electrical drawing analysis.

1907


In Safe Guarding test what means by "Failed to Danger" ?

2108


How to Calibrate Vortex Flow transmitter in field

1211


What is the purpose of bypass valve across AS valve.

2052


Give 2 application of quartz crystal used for process parameter measurement.

1972


How to calibrate RC Feeder system in thermal power station?,If any instrument available to calibrate it,ple inform me. make:stock,

3125


Can Any body tell me about the Contact or Email id of any good Consultancy which help me to find a job in Instrumentation Field in India .I have Six years of Work Experience in the Same field.Please revert me back on shammi_gwalior@yahoo.com ?

1789


Can any one send me IOCL instrumentation question papers.. i dont know the pattern of the questions and what to prepare can any one help me on this .. my email id is anwarnishil@gmail.com

2211


what are the documents(Construction point of view for a process plant) submitted by contactor initially entering in to new site for client?

2142


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2118


how to calibrate load cell

2777


what is cold loop? difference between hot and cold loop?

2180


Draw a simple circuit for a well head control panel used to protect the well against fire, leak, blockage, ESD, & controls the operation of one downhole & one surface safety valve. Explain the operation and controls

1574