Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.

Answer Posted / bharath m,+91 8438238335/99806

2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Solution :
(Pls. refer construction practice book & IS 2911 Part-III.)
2 under reamed pile means there are 2 Nos. of bulbs at particular spacing based on friction of soil.

Dia. of pile : 0.30 m. ie.,bulb dia. = 2.5 times dia. of pile
So it is 2.5*.3 = .75 m.
Length of Pile = 10.00 m.
Bulb thickness at pile intersection end (30-45degree inclination)= 1.75 times pile dia.
=1.75*.3
=0.525 m. &
free end = dia. of pile/4
=.3/4
=0.075 m.
Now follow the calculation:
Step 1:
Pile volume = Area x length
3.14/4*dxd x length
=3.14/4*.3*.3*10 = 0.707 Cubic Metre. ------1

Extra for Bulb Volume = Perimeter x Depth of bulb
=2*3.14*r x db
r at centre line of bulb = ((.75-.3)/2)+.3 = 0.525 m.
V=2*3.14x .525x(.525+.075)/2
=0.989 Cum. for 1 Bulb
V for 2 Bulb = .989*2
=1.978 Cubic metre -----2

Now combined Total Volume of Concrete 1+2 = .707+1.978 = 2.685 Cubic Metre.

Is This Answer Correct ?    44 Yes 53 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define a polyline?

1293


PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.

2637


A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

2304


What are the advantages of cad?

1142


What tor stands for in tor steel?

1120


How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

2463


how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2640


What is the difference between built area and super built up area?

1327


What materials were used to build the golden gate bridge?

1363


What is the maximum strength of cub compress strength in one cub testing

1921


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

2318


How to design staircase.plz tell me formula for the design the staircase.

2042


How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?

1977


How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir

1611


what is pouring and explain

2397