Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.

Answer Posted / gopi

(3.14*0.3*0.3/4)*10=0.7065m3

Is This Answer Correct ?    19 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What black man invented the clothes dryer?

691


The 4 main factors to start a construction project are––

1796


what is the meaning of 40/20 src

5771


How to calculate quanty of steel in four leg stirrups?

1460


How to determine thee cut length for steel reinforcement bars in R.C.C design

1069






Explain what is 1/8 on the architect ruler denotes?

676


How to calculate quantity of plum masonry in 1:3:7

2527


What is the effect of a building collapse?

627


what is total volume of ingredients used in concrete accordingly

1814


WHAT DLC DESIGN IN CONSTRUCTION

1654


Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

673


cause of cylinder test failure

2836


how to do cementicious paint for rcc walls of cw pump house

1551


What is difference between code and standard and specification?

1813


What is Architect-Prepared Contract?

738