Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many bricks are required for masonary trench having
length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr
on single brick work as well as double ( 9" ) brick work

Answer Posted / amit

4219

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

material used for mendrel use to bend epoxy coated rebar

2236


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2433


what are the changes in concrete pour height as per IS 456, 2009?

3092


what is the difference between replacement of cement by groundnut shell ash

3116


What is progress payment?

1200


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2454


What is different between DI Pipe and CI pipe?

2084


How and where are aqueducts built?

1141


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

2205


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1891


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2047


what pressure the NP2 class RCC pipe can sustain?

2649


What is the use of offset command?

1096


What is the purpose of Chipping in the heavy foundation?

1555


In a concrete grade C35A, C & A stands for what and equalent cube strength?

3595