Answer Posted / manikandan.c
LBB means local breaker backup protection.This relays are
associated with some important main relays like
distance,differential and busbar relays.If main relays are
fail to open circuit breaker(or any mechanical problem in
breaker) under fault conditions,The LBB relay gives trip
command the same breaker for 100ms.If also not open means
next 200ms,It gives initiation for main busbar protection
and followed by busbar protection operated and direct trip
command send to the remote end.And finally protect the power
system.
| Is This Answer Correct ? | 25 Yes | 5 No |
Post New Answer View All Answers
how do u gauge the size of the cable ?for eg. consider a 300 sqmm L.T Cable.How do u determine the size of the cable seeing it pratically?
How to decide the size of the capacitor for a single phase induction motor say 2 HP ??
What is the difference between vector surge relay (78) and Pole slip relay (98G)
Can anyone provide with a SLD for HT panel installation for a 33KV line and distribution end has three 1.5MV transformers. Is it suitable to use OCB or VCB and also provide me the suitable rating and its connection diagram.
what are symmetrical and non symmetrical components in electrical installation.
Will any motor burn if voltage provided is lesser than the rated voltage???? If yes, then how is speed control possible with voltage control
is there any lightning by passer is arranged in ship like buildings?
Good morning: I'm looking for some informations about the OLTC or the LTC: I wont to know what the function of the tie-resistor in during the operation of reversing/coarse operation Cordially
Name of the relay of low lub oil presuure in DG sets
work of choke in florocent tube circuit ?
Whether 3 phase induction motorwith 100 hp capacity , Amp 160 for which sensitive earth fault relay , type CTUM 15 can be used?
what is vA rating and class of a ct.
hi friend i am going too attend for hpcl in this month please help me by sending written test question papers i am in the stream of E.E.E
what is the operating time for LBB and how does the LBB relay realise whether cb is opened or not?
why swityard is necessrry requirement in any bis power distributin systems?