Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the ratio of M10,M20,M30,M40,M50,M60 grade concrete

Answer Posted / selvakumar b

M5-1:5:10;
M7.5-1:4:8;
M10-1:3:6;
M15-1:2:4;
M20-1:1.5:3;
M25-1:1:2;
M30-1:1:3;

Is This Answer Correct ?    58 Yes 38 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982

2018


how u design STAGING for Superstructure in BRIDGE construction?

2306


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

5325


any book or article on pumped concrete.

2171


What is the Roll of Water Bonding under VDF road?

2611


What is Gsb tollens ?

1958


why building got air crack? if it get in one particular are what is means?

2416


how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step

2130


How to hide dimensions in autocad?

1115


Rate analysis of Vitrified tile in cement mortor 1:3

4424


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

13309


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

2382


Which stone is best for wall construction Laterite Stone or Cement Blocks

1817


) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.

2703


what could be the production cost of 1 cum of concrete by CP30 plant

1674