What is full form of EANs in Basic Data 1?
Post New Answer View All Answers
What is planned consumption and unplanned consumption?
What are gaps? Some examples?
What is sla (service level agreements)?
Mention what are the production process in sap?
What is MRP group?
List out the basic procedure for dispatching operations in capacity leveling?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Explain 'mrp' (material requirements planning)?
What is time phased Planning?
Explain what is the need of mrp list if the stock requirement list is already given?
What is MRP Profile and MRP Group?
What is the production process in sap?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is qualification deficiency?