Answer Posted / guest
one way slab and two way slab
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
how to absorb to site basic corrections? which are the important correction?
Explain what are the skills required to become an architect?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
what is the most suitable foundation when construct a bird watching tower in a marshy land
How cracks in concrete can be avoided?
What in bending moment, if a moment is free end of cantilever beam?
what is flashing?
how much used soil in 1 brick of standard size?
how to tie 10 legged stirrups
door and window wood work calculations and different methods
What are the basic use of runners and standards of pipelines?