Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHERE IS THE LIGHTING ARRESTER SHOULD BE PLACED IN
DISTRIBUTION LINES?

Answer Posted / amit kumar

lighting arrester shoul be placed on both side of the
switchyard.at the starting end with each phase lighting
arrester should be places and at the end point of switchyard
with each phase it should be placed.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hello sir i m student of gtu .what is idp.

2199


What is self exciting?

1704


What is the difference between the transmission line and distribution line?

1167


what is meant by 2 within a star in a voltmeter dial?

2092


if 3400kw slipring motor rotor shorting done and motor started on mv drive ,what will be the rotor shoring current

1721


The 3 phase Delta connection RB=440V, BY=350V,.......* is Line to Line voltage RY= ? And Formula....?

1716


Dear sir, I completed DECE In the year 1995.Now i am working in a private company from last 10 years as an Electrical supervisor.The company having a 1000 KVA transformer.Now i try to apply "C" Licence. I am eligible or not.If not eligible,pls give solution.

1753


As you achieve greater success with the company after some years, Will you like to be a share holder in our company?

2816


what is the setting of locked rotor in HT motor ? (answer expecting in percentage)

2291


What are the types of windings according to the construction?

1122


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2819


what is meant by power and distribution transformer ?

1990


While converting delta into star or star into delta ,the three values of resistances remains unchanged .Find out the value?Let In star R1=x;r2=x;R3=x On converting into delta,R12=x;R23=x;R31=x Find the value of x

1938


how to determine ct ratio in ht vcb?

1849


What is the form name of 'c' license, I want to download in web