what is the meaning for 'prime cost' in civil construction
contracts?
Answer Posted / prashant
it is a single fixed price contract in which contractor
agrees to perform specified job for fixed sum.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
why does the most of civil engg is not intersted to going for teaching field?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
What is the procedure of concealed plumbing in toilets?
what is Short bored pile foundation.
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
How is improve my knowledge in construction industries....
how to nfind out the specific gravity of sand.aggregate,water please help...
What is an ice dam sock?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
Slump Values for works?