Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Answer Posted / swapnil2424
20 nos steps
| Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Define What does civil status mean?
types of laps in column
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
What is command line?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
How can we demolish concrete beams?
what is the exact dia of 8swg and 10swg gabion wire
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
How is make concrete cube?
how to absorb to site basic corrections? which are the important correction?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?