As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / naveed
first of all problem root cause need to be identified and people responsible should be penalized .then rectification options should be be enlisted and effective way need to be adopted for correction..
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
what is mean by reestimation?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
what is conrete grade ,how are depent on concrete grad and size of concrete?
Gidc technical que paper
how to calculate the steel in 500yard
What is the biggest dam in america?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
Define block?
Explain creep?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
how to calculate quantity of bricks in circular manhole with examples.