i Have Completed a Intermediate Vocational (Construction
technology) with Bridge course ,iam elegible to join in
Institute of Surveyors(india).

Answer Posted / hidayathulla

yes

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

RR masonry rate analysis

2651


What is need for setting limits?

656


what"s the sort of beams?

1822


how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1441


how to calculate valuation for the old building?

1812






Can we use concrete of slump cone in cube casting in which we have already measured slump?

1269


why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

2757


1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40

2268


Form where IS456 is adopted in 1978?

1502


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

775


What is Joule Brayton Cycle?

772


what is E VALUE FOR WOOD

1533


why we are useing plastic under the lean concrete?and whts the advantage?

2163


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1680


Please design 12.5m long dubbly beam

1481