Answer Posted / guest
belt
| Is This Answer Correct ? | 18 Yes | 6 No |
Post New Answer View All Answers
how to success for interview
why to work in oil industry
What is hertz in electrical system?
What is meant by transmissivity?
Greetings This question is about hydraulics and I request an expert to answer it. A simple hydraulic machine is made up of two heads, a larger one with a larger force inside a wider pipe and a smaller one with a smaller force inside a smaller pipe in width as in the second picture on this link: http://science.howstuffworks.com/hydraulic1.htm The question is this: what happens if the smaller head and the smaller force doesn’t exist but the smaller pipe is high enough to take all the liquid? For example the larger head is 1.00 sqr metre and can go down 1.00m under a weight of 100.00kg. The cross sectional area of the smaller pipe is 0.001 sqr metre. Now when the larger head goes down 1.00m, how high the liquid from the wider pipe can go into the smaller pipe of the cross sectional area of 0.001 sqr metre? Regards
how the magnetic trains are leviated(MAGLEV)?
Explain what are the thermal conductivity properties of brass?
Who all falls under the Perview of Excise Duty, we mean who has to pay the Excise Duty, eg: does all mfrs have to pay ED or who has high turnover they should only pay ED, if yes that what is the Turnover limit?
An employ has after increment has Gross Salary 22000 rupees per month. Earlier he was covered in ESI . now should we deduct ESI from his salary or not.
What is NPSH of Pump
Which has the greater pressure in a stern tube sealing seawater or L.O.
What is the critical speed. Compare the critical speed of hollw shaft and solid shaft.
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is fuel ratio ?
How do I calculate 2% Butane in 29.66 CFM?