In structural steel work what should be the wastage percentage
considered to order the material( 200x200x5mm box section) in
standard available sizes in India i.e. 6 mtrs?
Answer Posted / prashanth
5% of the total weight of the structural steel.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
What is alternate bid?
Will water damage concrete?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
How many litres of water used for curing of 1000sqft of slav
What tor stands for in tor steel?
Which is stronger solid steel rod or hollow steel pipe?
How to do rate analysis for concrete work including shuttering work?
What is the crank length in the slab?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
What is the per cu. mt. price of ready mix in Gujarat region.?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches