why we do multiply 1.54 for dry volume of concrete?
Answer Posted / hidayathulla
First your question is wrong. how ever
for one cum:- ADD 30 to 33 % dry volume Because the volume will reduce after mixing water.so that we add that %. and
for one cum:- ADD 20% of wet mortor for wastage,Uneven surfaces ect.
there fore for one cum :- 1+0.3+0.2 =1.50 to 53.
we can use this at the time of material requirement ect.
| Is This Answer Correct ? | 62 Yes | 17 No |
Post New Answer View All Answers
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
how to disign cuplock shuttering and it's matireal requirement snd any related web site
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
what is tension footing?
what is the Asfalt test?in road constraction..?
The mixture of different ingredients of cement is burnt at?
Define What is Civil Engineering?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
Which purpose we use deck anchor in bridges?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)