Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate numbers of carpenter, fitter, mason, unskilled worker on
the basis of built up area or floor plat area of building?

Answer Posted / prasanth

work done/per day

Is This Answer Correct ?    3 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much cement,sand,bricks and water needed for 1square metre brick work?

1819


Ratio for 4500 psi concrete

1632


how to convert cement, sand aggregate quantity from M3 to kg with full description?

2107


How much cement is require in one sqft area in a G+3 residential construction.

2115


how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab

2438


insted of bentonite we can use any alternate material in piling ?

2164


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2596


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

2426


Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.

2103


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2858


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

2154


how much shouid be the rate for ready mix concrete per cubic meter

2024


What is a kip?

1205


What was asked in isro civil interview

1122


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

2035