how many no of solid blocks and bricks required for construction of wall for 100 sqft?
Answer Posted / santosh ukarande
Brick size-9"x6*x4" or .23x.15x.10m (100s.ft=2.83m^3) with mortar thk. 10mm i.e(.24x.16x.11m) bricks no.= (2.83 / .24x.16x.11) = = 673.81 no.s with wastage 5% = 707.49 no.s say 708 no.s bricks reqd. for 100 s.ft brick work.
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
Would you cause a 55-gallon drum of water to weigh more by climbing in?
what does the grad of cement shows (denotes)?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
How will be cutting in timber plate size 600*400 column size
Gidc technical que paper
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
why we use aggregate,sand with cement in concrete?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
How can we demolish concrete beams?
What are the problems one might face while having a Cantilever balcony?