As per thumb rule cement required per 1 cum of M20 concrete
is 411Kg/cum(1.57/5.5=0.285cum of cement i.e
0.285*1440=411Kg).But as per PWD rate analysis cement
required is 347Kg/cum.the difference is 64Kg.This kind of
difference is coming every grade of concrete.Can you give
perfect suggestion regarding this.
Answer Posted / pranav panchal
This difference comes due to the mix design of the concrete
At every place the mix design depends upon the material & material source so if PWD is considering the cement consumption that means their mix design shows this cement consumption
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
List out some of the common problems that architect have to tackle it?
how is the reinforcement is distributed in triangular slab
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
What is min thickness,min grade of conc & age of PQC ?
How many pyramid in egypt?
What is bylayer?
undistributed samples are obtained by
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
what is work of planning deptt. in any construction compny (in road project)
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
What is the difference between chamfer and fillet?