Suppose a new brick wall is being constructed,and the
courses and not aligned horizontally,what negetives can it
cause?
Answer Posted / ratheesh
Causes:
1. Crack il be found in the wall.
2. plastering thickness il be more.
3. Room dimension il be change.
4. If its load bearing wall, its won't take lode properly.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What out turn civil works
Why are the bolts that hold steel rails together in oval holes?
what is the basic difference between Coloumn & Shear Wall
What are the steps involved in the concreting process?
How foundation is designed, Column design and beam design
60-70 grade of Bitumen is VG-30 ?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
why we are using stub column..? is it possible to construct steel stub column..?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is meant by cartesian coordinate system?
what is meant by shear center?????
what is Bearing Capacity,How to determine it?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
How much cement,sand,bricks and water needed for 1square metre brick work?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?