Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the use of Turbocharger in a gen-set?

Answer Posted / firoz n

Ans 1 is correct..but the process is done with the energy
from exhaust air..

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is ramp signal?

1111


A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.

3061


What is the size of a 60 watt and 80 watt tubelight?

2168


what is transistors comprised of?

1182


Define the term Capacitance and Inductance?

1120


Define bibo stability.

1082


what are the things that can cause a three phase motor to crawl?

3576


State the frequency for rc phase shift oscillator?

1129


What is meant by harmonic distortion?

1119


How relay coordination has to be done? what are the inputs are required for this? Please explain this with calculation method?

1840


What is dynamo?How it works and what is the function of dynamo in a DG.

2593


What are :- AC Distribution Board (Single & Double Front) DC Distribution Boards Distribution Board LT Breaker Panel.

2095


Explain Need of a starter in a dc motor.? Also explain any two starting and speed control method of dc motor?

1723


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

982


USE OF 8 WAY PAN ASSEMBLY

1966